Picture handover week. The furniture is late. The electrician says the ceiling team boxed in his wiring. The ceiling team says the drawings changed. The designer says the change was approved.
Everyone is right. That’s the problem.
Why fit-outs slip
A delayed fit-out is rarely about one bad contractor. Each vendor does their own job. What no one owns is the job in between:
- Sequencing trades: wiring before ceilings close, flooring before furniture arrives
- Chasing approvals: landlord, building and fire NOCs all take time
- Tracking changes: one design tweak can quietly break another team’s work
When that job belongs to no one, it lands on you.
What turnkey solves
Turnkey means one team is accountable for the whole result, from empty shell to move-in day. You get one contract, one schedule, one point of contact, and no finger-pointing between vendors.
“When something goes wrong, who do I call, and who answers for it?”
If the answer takes more than one sentence, the gaps are still yours.
FAQs
What is a turnkey office fit-out?
One company handles design, approvals, procurement, construction, furniture and handover under a single contract.
Is turnkey more expensive?
Not necessarily. Separate vendors may look cheaper, but delays and rework add hidden costs. Turnkey prices the full scope upfront.
Will I lose control over the design?
No. You approve layouts, materials and budget at each stage. You hand over the coordination, not the decisions.
When should I start planning?
Before you finalise your lease or move date, so there is time for surveys, approvals and long-lead orders.
Conclusion
Fit-outs slip in the gaps between vendors, not within them. Before you sign, make sure you can name the one person accountable for the whole project.